The Standard Electric & Power Company
All projectsPROJECT 01 / RESIDENTIAL GENERATOR BACKUP

Kohler · Managed Standby & Electrical Upgrade

SANTA ROSA VALLEY · VENTURA COUNTY

Automatic + managed standby power. A complete electrical infrastructure upgrade.

This was not a generator-only project. The coordinated scope combined a Kohler automatic standby system with replacement 200 A meter-main equipment, a new outdoor distribution load center, an automatic transfer switch, branch-circuit transition and load-management equipment, and whole-house surge protection. Dedicated underground natural gas, HVAC soft starts, a reinforced generator pad and localized exterior restoration completed the infrastructure plan.

Generator and upgraded electrical infrastructure
STANDBY GENERATORKohler 26RCA24 kW natural gas · automatic standby
ELECTRICAL UPGRADE200 A serviceNew Siemens meter-main + outdoor load center
AUTOMATIC TRANSFER200 A RXTDownstream of new meter-main service disconnect
LOAD MANAGEMENT3 managed loadsTwo A/C systems + pool · two HVAC soft starts
THE TECHNICAL APPROACH

Why this configuration?

Dependable backup power takes more than a generator. Here’s how the electrical upgrade, load strategy and outdoor work fit together.

ELECTRICAL INFRASTRUCTURE

One coordinated electrical system

Rather than simply adding a generator, the project updated the home’s 200 A service and distribution equipment and added an automatic switch to transfer power during an outage. Surge protection and organized outdoor controls brought the equipment together in one power path. The home’s 200 A utility-service rating stayed the same.

SIZING & LOAD CONTROL

Sized for the home. Managed for real life.

The home’s calculated demand exceeded the generator’s 24 kW natural-gas output. Rather than assuming everything can run at once, automatic controls can temporarily pause the pool equipment or either A/C system when demand is high. Soft-start devices also help reduce A/C startup surges. The goal is to keep priority loads powered while respecting the generator’s limits.

FUEL & SITE WORK

Care in every connection and finish

A well-planned backup system goes beyond the generator itself. This project’s scope included approximately 100 feet of underground natural-gas piping, a reinforced concrete pad, carefully routed exterior conduit and localized stucco restoration. These details help the equipment fit the property and remain accessible for future service. Gas work and required approvals involve appropriately qualified parties.

CONCEPTUAL POWER PATHPower source selection is automatic · not an as-built one-line
UtilitySCE service
Siemens meter-main200 A service disconnect
Kohler RXT ATS200 A automatic transfer
Siemens outdoor panelNew branch-circuit distribution

During an outage, the Kohler 26RCA feeds the ATS generator input. Priority-based relays manage selected A/C and pool loads; the 200 A utility-service rating does not increase.

Designated demand control Three prioritized load controls → pool and two A/C systems, plus two soft starts
Explore the interactive power and load-management sequence
FOLLOW THE POWER

What happens when the lights go out?

SIMPLIFIED HOMEOWNER VIEW
02 / BACKUP POWER

The generator takes over automatically.

If utility power fails, the generator starts. Once its power is ready, the automatic transfer switch supplies the backed-up household circuits.

BACKUP MODE
WHERE THE POWER COMES FROM
Utility companyPower unavailable
Standby generatorProviding backup power
WHO SELECTS THE SOURCE
Automatic Transfer SwitchATS · 200 A equipment rating*GENERATOR SELECTED
WHAT GETS POWER
YOUR HOME
Backed-up circuits
Refrigeration Lights Selected outlets
Selected circuits receive backup power
AND WHAT ABOUT AIR CONDITIONING AND THE POOL?CONTROL DECISIONS — NOT POWER WIRING
Automatic load managementControls monitor the backup plan
CONTROL SIGNALS
Downstairs A/CMay run if capacity allows
Upstairs A/CMay run if capacity allows
Pool equipmentMay run if capacity allows

What this means for you: There is a brief interruption during generator startup and transfer. Backup applies to connected circuits, not necessarily every appliance.

How to read this visual: The solid arrows above represent the main electrical power path. The load-management strip below represents separate control decisions, not another power feed.

*The generator's illustrative 24 kW natural-gas model rating and the 200 A ATS transfer rating describe different equipment capabilities. This is a simplified educational diagram, not an as-built wiring or approved one-line drawing; model details and control behavior require final verification.

GENERATOR INFORMATION

Interested in an option like this? The short form asks for your contact information and the type of generator help you're looking for.

© 2026 THE STANDARD ELECTRIC & POWER COMPANY, LLC · MOORPARK, CALIFORNIA · 805-991-2639

Homeowner information and project examples only. The Standard Electric & Power Company, LLC does not currently hold a California C-10 contractor license. No construction contracts or service appointments are offered through this website; regulated work requires a separate agreement with an appropriately licensed contractor.